Bio Gas

Biogas is a sustainable solution that supports communities, agriculture, and industries while reducing environmental pollution.

Descriptions

Biogas is produced by the natural breakdown of organic materials such as agricultural waste, food waste, and livestock manure. At GB Green Energy & Development, we design and install biogas systems that convert waste into valuable energy for heating, electricity generation, and industrial use. Our solutions help reduce carbon emissions, lower waste management costs, and provide a reliable source of renewable energy. From small household units to large commercial digesters, we tailor every project to meet your energy goals and sustainability needs.

1. Survey

We begin by analyzing available organic waste, evaluating site conditions, and determining the appropriate biogas technology for your project.

2. Cost Estimate

Our team prepares a detailed cost estimate covering system design, digester capacity, installation, equipment, and operational requirements.

3. Developing process

We create a customized biogas plant design focusing on efficient digestion, gas storage, safety standards, and long-term performance.ment, and operational requirements.

4. Launch Project

Our engineers install the biogas system, test all components, and ensure safe and efficient operation before officially launching the project.

Other Services

Have any Questions?

We’re here to help you with hydro power planning, installation, and consultation.

Get a Quote

Our Services

Frequently Ask Questions

Biogas is a renewable energy source produced when organic waste—such as food waste, manure, or agricultural residue—breaks down in an oxygen-free environment.

Biogas can be used for cooking, heating, electricity generation, and even as fuel for certain industrial applications.

We provide small domestic biogas units, medium-scale community plants, and large industrial biogas digesters for farms, factories, and commercial facilities.

Suitability depends on the amount of organic waste available, space, and environmental conditions. We conduct a full site survey and waste analysis to confirm feasibility.Depending on the system size, installation typically takes 2–7 days after the initial survey and design approval.

 

Installation time varies based on plant size. Small units may take a few days, while large industrial systems can take several weeks.

Location

We're here to help.