Project

2 units of 0.5 MW to Hydro power station

2 units of 0.5 MW to Hydro power station Ghanuk Kharmang

About The Project

2 units of 0.5 MW to Hydro power station Ghanuk Kharmang

Project Overview

This document outlines the scope of work completed for the supply, installation, commissioning, and test running of two new generation units at the Ghanuk Kharmang Hydropower Station (HPP) in Gilgit-Baltistan. This small-scale project is crucial for providing reliable, decentralized electricity to the local communities in the Kharmang region.

Installed Capacity

Detail Project

Installed Capacity

The project involved the installation of two small-scale generation units:

  • Number of Units: 2

  • Unit Capacity: $0.5\text{ MW}$ (Megawatts) each

  • Total Installed Capacity: $1.0\text{ MW}$ (Megawatt)

The $1.0\text{ MW}$ capacity provides essential local power, enhancing the energy security and supporting the livelihoods of the people in the Ghanuk Kharmang area.

Scope of Work

The contractor, Mushtaq Ali Government Contractor Gilgit Baltistan, was responsible for the following comprehensive activities, covering the entire $1.0\text{ MW}$ installation:

  1. Supply: Procurement and delivery of all necessary mechanical, electrical, and civil components (including Turbine-Generator sets) for the two $0.5\text{ MW}$ hydropower units.

  2. Installation: Complete physical installation of the power generation equipment, control systems, and associated civil infrastructure at the site.

  3. Commissioning: Detailed functional testing of all installed equipment and systems to ensure they operate according to design specifications and safety standards.

  4. Test Running: A sustained period of operational performance testing to confirm the units’ reliability and stable output capacity prior to final handover.

Project

Project in capture