Project
2 units of 0.5 MW HPP
2 units of 0.5 MW HPP Terishing Astore Gilgit Baltistan
About The Project
1.5 MW HPP Parishing Ph-III Astore Gilgit Baltistan
Project Overview
This document outlines the scope of work completed for the supply, installation, commissioning, and test running of two new generation units at the Terishing Hydropower Station (HPP) in Astore, Gilgit-Baltistan. This crucial small-scale project is vital for providing reliable, clean electricity to the local communities.
Detail Project
- Mushtaq Ali Government Contractor Gilgit Baltistan
- 2019
- Terishing Astore Gilgit Baltistan
- Hydro power
Installed Capacity
The project involved the installation of two small-scale generation units:
-
Number of Units: 2
-
Unit Capacity: 0.5MW (Megawatts) each
-
Total Installed Capacity: 1.0MW(Megawatt)
The 1.0 MW capacity provides essential local power, enhancing the energy security and supporting the livelihoods of the people in the Terishing area and the wider Astore District.
Scope of Work
The contractor, Mushtaq Ali Government Contractor Gilgit Baltistan, was responsible for the following comprehensive activities, covering the entire 1.0 MW installation:
-
Supply: Procurement and delivery of all necessary mechanical, electrical, and civil components (including Turbine-Generator sets) for the two 0.5 MW hydropower units.
-
Installation: Complete physical installation of the power generation equipment, control systems, and associated civil infrastructure at the site.
-
Commissioning: Detailed functional testing of all installed equipment and systems to ensure they operate according to design specifications and safety standards.
-
Test Running: A sustained period of operational performance testing to confirm the units’ reliability and stable output capacity prior to final handover.